Services Of Dibrugarh Municipal Board

Water Supply


Till date there is no water supply scheme under Dibrugarh Municipal area. Though, within this financial year 2017-2018, the esteemed citizen of Dibrugarh will be provided with a water supply project big enough to cover around 20,000 household under AMRUT (Atal Mission for Rejuvenation and Urban Tranformation) at a cost of Rs. 183.000 Cr.


Solid Waste Management


A) Garbage Generation/ day in the town = 35 MT.
Characteristics: - 


Paper Etc. Metals Glass Textile Plastics Wooden Matter Organic Substance, Earth Ash etc.
13.73% 0.10% 1.80% 12.40% 9.80% 1.10% 61.07%

B) Garbage dispose/day = 31 –33 MT/day

C) Available infrastructure -


Dibrugarh Municipality use to collect the Garbage from Collection point/ Dust bin from 6 AM and dispose the same at Garamur Dumping Ground, 3 Km away from the city. The present system of disposal is open land filling. A research work has been undertaken with Regional Research Laboratory, to find out a suitable technology for disposing the garbage scientifically with minimum expenditure. Up till now no treatment plant could be set up for financial constraint of the board. It is estimated that, to establish solid waste plant, a sum of Rs.2.90 corers will be required to implement the Honorable Supreme Court’s order on the P.I.L. filed by the Almita H Patel Consequent upon non enforcement of the Bajaj Committee recommendation, that attempted to stem the cause of plague that etched dark chapter in the history of Surat in Gujrat.


Vehicles


Dumper 2 Nos.
Tractor & Trailer 9 Nos.
Hand Cart 28 Nos.
Excavator 3 Nos.
Robot 1 No.
Ambulance 1 No.
Swargarath 1 No.
TATA DI-207 1 No.
TATA Magic for TAX 2 No.

Storm Water Drainage


Total length of storm water drainage in the town is about 200 Km. out of which 10% is pukka and balance is Kutcha drain. Dibrugarh Municipality is having strength of 55 Nos. workers with the help of which drainages are maintained. Due to lack of permanent drains in several residential colonies water logging problems come up during monsoon.


Roads and Transportation


(i)   Earthen road 9.64 km.
(ii)  Gravel & sand gravel road  17.63 km.
(iii) Brick pavement road 35.94 km.
(iv) Asphaltite road 17.25 km.
TOTAL ROAD LENGTH      86.46 km.

Street Lighting


Presently Board is covering 52 Km of road length by means of 700 street light out of which 120 Nos. are S/v lamps, 280 Nos. tube light and rests 300 Nos. are CFL light and bulbs. The deputy Commissioner, Dibrugarh has recently introduced a project of streetlight naming as project “POHAR” for illumination of streets. In this project already several areas is illuminated with the help of public participation.


Parks


There are 5 Nos. of Parks under Dibrugarh Municipal Board with a very minimum facility. Though there are lots of Historical monuments in and around the town, which can be converted in to ideal recreation Centre, Board could not take up the works due to financial hardship.